Wednesday, December 2, 2009
Engineer
We received a very favorable quote from a Civil Engineer. He stated that he should have the engineering plans ready by this Friday. This would be great, as would then be able to submit our plans to both the city and health department early next week. The plans include securing the fermenter tanks to the floor, foundation plans to support a boiler and it's vent stack, glycol chiller and a grain silo. It will also include anchoring the posts for the swing gate that will be attached to the above mentioned foundation. A portion of the plan accounts for the walk-in cooler that we are going to install. It has dimensions of 27'L X 16'W X 12'H. The city requires any structure over ten feet high to have an engineering stamp on it. I guess this is because they don't want the walk-in to cave in on itself? With our relocation of the walk-in cooler, we will be able to secure to a foundation wall which will be nice.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment