Sunday, April 4, 2010

Demo day


GeoTagged, [N33.64333, E117.91672]

We spent a large part of Saturday tearing down walls, drop ceilings, lights, a/c vents and a window to make more room for our brewing operation. We still need to take up the linoleum tiles (which will not be fun). This type of demolition is not all that fun and doesn't really look all that great because of the pile of drywall, insulation, scrap metal and other items that need to be disposed of. Next up for demolition are the warehouse flooring (for our trench drain installation) and warehouse bathrooms. We need to get the bathrooms up to ADA compliance.

No comments:

Post a Comment